Use Balloon2D to recognize data from 2D drawings: automatically generating bubble charts and customizing bubble chart numbering is incredibly handy!
Release time:
2026-07-20 16:25
Source:
MBD has been repeatedly discussed, yet what is often opened at the engineering site is still a sheet of 2D drawing . First-article inspection involves numbering each item and transcribing the checklist item by item, which is time-consuming and error-prone yet determines the accuracy of quality data. When dimensions, tolerances, and geometric symbols can be Automatic recognition and generate controllable rules Bubble chart , the drawings have only just transitioned from “images” to “data.”
01 Why is digitizing 2D drawings imperative?
2D drawings have not gone out of style. In the automotive, aerospace, shipbuilding, and heavy machinery industries, 2D drawings remain the primary medium for conveying manufacturing intent. [1] ; For some suppliers (who only have access to 2D drawings), 3D models are often unavailable, and the drawings typically serve as the final contractual reference guiding manufacturing and assembly. [2] 。
Manual extraction is costly. Dimensions, tolerances, and materials have long been transcribed manually; “automating this process can improve efficiency and reduce errors.” [3] ; Misinterpretation leads to incorrect tool and machining parameter settings, part defects, and severe production delays [4] . According to the ASCE 2021 report, among the 617,000 bridges in the United States, Over 42% have served for more than 50 years. Meanwhile, bridge inspection, condition assessment, and quality assurance processes remain heavily reliant on manual labor, and a shortage of skilled professionals is further slowing progress. [5] 。
Historical drawings have a time window. Many German highway bridges were built between 1960 and 1985. [5] , samples of printed and handwritten text from bridge drawings also date back to 1960 [6] ; For legacy parts, only the drawings often remain while the CAD data has been lost, and digitization enables them to be reproduced even decades after production ceased. [7] 。
02 What does digitizing 2D drawings entail?
▍Page Layout Segmentation and View Recognition
First, locate the drawing border, title block, and each projection view. View detection based on YOLOv7 was performed on 2,000 manually annotated images. Bridge engineering drawings (Training/Validation split: 8:2) After training for 200 epochs, the validation set mAP@0.5 is approximately 0.92 , mAP@0.5:0.95 stabilizes at 0.64–0.68 [5] ; however, view partitioning remains a challenge—some research systems still cannot distinguish between different projection views within the same drawing, making it difficult to consolidate multi-view dimensions into a single feature. [7] 。
▍Text Recognition and Geometric Dimensioning and Tolerancing Analysis
The core of production drawings is Information Panels, Dimensioning, and Geometric Tolerances The three elements, the latter of which is expressed using a Feature Control Frame (FCF) [3] ; Identified objects can be further categorized into GD&T, general tolerances, materials, dimensions, notes, radii, surface roughness, threads, and the title block. Nine categories of labels [4] 。
▍Structured Output and Semantic Association
The result should be structured data that can be directly used in CAD/CAM and quality inspection workflows. [4] ; Further still is mapping back to the 3D features—on 20 real-world “CAD–drawing” pairs, comprising a total of 101 mappings, the average precision is 83.67% , recall rate 90.46% , F1 86.29% (This dataset is primarily annotated with dimensions, with very few geometric tolerance samples.) [1] 。
03 How to choose a software tool for digitizing 2D drawings?
Existing research has identified four selection criteria: Availability of pre-trained models, support for the target language (German in this study), handling of both printed and handwritten text, and compatibility with the Windows operating system. [6] . In addition, three points are particularly crucial.
General-purpose OCR and large models are both insufficient. Dimension recall rate of the specialized tool eDOCr2 on a controlled datum composed of 7 drawings from different sources. 93.75% , Size character error rate 0.73% , Feature Control Frame Recall Rate 100% ; Under the same benchmark, GPT-4o's feature control box recall rate is 0% [3] 。
Position and robustness are hard metrics. Visual language models return only text strings and not coordinates. [3] ; on 200 printed text segments, when the segment is rotated −90°, Tesseract's All four similarity metrics dropped by more than 0.8, and performance completely collapsed. (While at +90°, it is almost unaffected and exhibits directional asymmetry); based on these findings, the study suggests that visual-language models achieve optimal robustness when ample computational resources are available, whereas traditional OCR is more suitable for offline, low-cost processing. [6] 。
The human-in-the-loop is indispensable. Large models exhibit visual hallucinations and non-determinism. [8] ; In industrial drawing retrieval experiments, the graph neural network model with the highest retrieval metric (Recall@1 = 0.904) received only a practicality score of 2.56/5 from three domain experts, lower than that of a visually-based model with a lower metric (3.60/5). [9] 。
Existing semi-automatic approaches—such as bubble-chart annotation techniques and commercial tools—while offering some automation, still rely heavily on manual input, limiting scalability and introducing inconsistencies. —— Khan et al., arXiv:2505.01530, 2025 [4]
04MBDVidia_Balloon2D Advantages of Digitizing Drawings
According to the official manual definition, MBDVidia_Balloon2D It is "used to extract from 2D engineering drawings in PDF format Automatic Bubble Chart Tool with Capture Annotation ", and output a machine-readable list of characteristics (BoC) [10] 。
▍Automatically Generate Bubble Chart
Auto Capture Automatically captures annotations and converts them into a property list, supporting Range: 1-3, 5 Page range; Views Automatically detect and color-code views, Capture Tabular Data Identify title bars, family tables, and part/material/process data [10] . The results indicate status by color— Blue: Pending confirmation; Red: Suspected error; Green: Approved; Purple: Manually created , which is precisely the practical implementation of “human-in-the-loop” [10] 。
▍Custom Bubble Numbers: You Set the Rules
Continuous Consecutive numbering across the entire map, Range Define segments (granularity) by view, so that each view forms its own sequence; Start Index Set the starting number, Priority Give precedence to general annotations or welding symbols, Ignore Basic / Reference / Non-Measurable Determine whether the primary, reference, and non-associative dimensions are placed after the primary dimension or interleaved with it. [10] . To select a broken number, right-click after selecting the view. Pack Balloons Rearrange, key number available Lock Lockable; font, height, color, and inheritance of color and shape are all customizable; leader lines can be shown or hidden. [10] 。
▍Engineering Semantics and Deliverables: Straight to FAI
Annotation constructor overrides size and geometric tolerances ( ASME Y14.5-2009 ), welding symbols ( AWS A2.4:2007 ) and surface roughness ( ASME B46.1:2019 ); BoC with Tag 、 Dwg. Zone 、 Saved View Three-column anchored drawing position for each property [10] . The results can be exported as a bubble-annotated PDF, an HTML report, or ISIR / ISIR+ / AS9102 First-article inspection form, with the option to bind Excel reports to the software via Bind, enabling interactive updates of the model view in response to report changes. [10] . During the upgrade Update by Revision Compare the new and old versions and update automatically; re-captured content Still links to the same Tag —The numbering system remains consistent across revisions. [10] 。
Conclusion | 2D drawings aren’t going away; what will disappear is the repetitive manual labor surrounding them. When “reading drawings—numbering—tabulating” is streamlined into a single, auditable process, and numbering rules can be freely defined by engineers, drawing digitization shifts from a technical demonstration to everyday shop-floor practice—this is precisely MBDVidia_Balloon2D The value lies in.
References
[1] Khan, M. T., Chen, L., Feng, W., & Moon, S. K. (2026). Context-Aware Mapping of 2D Drawing Annotations to 3D CAD Features Using LLM-Assisted Reasoning for Manufacturing Automation. arXiv:2602.18296 [cs.CE].
[2] Zhang, C., Pinquié, R., Polette, A., Iida, M., De Charnace, H., & Pernot, J.-P. (2026). 3D CAD Models Reconstruction from 2D Drawings: A Survey and Future Challenges. Computer-Aided Design and Applications , 23(6), 646–678. DOI: 10.14733/cadaps.2026.646-678.
[3] Villena Toro, J., & Tarkian, M. (2025). Optimizing Text Recognition in Mechanical Drawings: A Comprehensive Approach. Machines , 13(3), 254. DOI: 10.3390/machines13030254.
[4] Khan, M. T., Yong, Z., Chen, L., Tan, J. M., Feng, W., & Moon, S. K. (2025). Automated Parsing of Engineering Drawings for Structured Information Extraction Using a Fine-tuned Document Understanding Transformer. arXiv:2505.01530v3.
[5] Peng, M., Cui, A., Kang, C., & Marx, S. (2025). AI-based extraction and management of text and view information from 2D bridge engineering drawings. In A. Moreno-Rangel & B. Kumar (Eds.), EG-ICE 2025 Conference Proceedings . University of Strathclyde Publishing. DOI: 10.17868/strath.00093312.
[6] Peng, M., Qian, H., Marx, S., & Kang, C. (2026). Optimizing 2D bridge engineering drawing digitization: A comparative study of text recognition tools and development of lightweight post-recognition structured information extraction methods. Results in Engineering , 30, 110186. DOI: 10.1016/j.rineng.2026.110186.
[7] Fries, M., & Ludwig, T. (2026). AI-Driven Analysis of 2D Technical Drawings for Agile and Reconfigurable Manufacturing Systems. In M. Manns (Ed.), New Paradigms for Anticipated Uncertainty (Lecture Notes in Mechanical Engineering, pp. 699–711). Springer. DOI: 10.1007/978-3-032-16889-4_66.
[8] Munguia, J. (2026). Leveraging AI for 2D technical drawing analysis, feedback and assessment in higher education. International Journal of Mechanical Engineering Education (online first). DOI: 10.1177/03064190251414394.
[9] Stockinger, F., & Ydkvist, L. (2026). Geometric Similarity Retrieval of Industrial 2D CAD Drawings Using Deep Learning [Master's thesis]. School of Engineering, Jönköping University, Sweden.
[10] Capvidia. MBDVidia Help Documentation . Sections: Tools > Drawing (Balloon2D); Operations > 2D PDF Ballooning; Options > Balloon 2D / Bill of Characteristics.
Digitization of 2D drawings,2D Drawing Data Recognition,Automatic Bubble Chart Generation,Custom Bubble Chart Numbering,MBDVidia_Balloon2D